top of page

PTE LTD
Projects

Well Intervention

Pressure Control Equipment

Piping System

Well Intervention
1/9
Process Air Duct
Pharmaceutical
Design, supply and install Stainless Steel Process Duct.
Existing technical room is full of equipment and our team has to manoeuvre through a maze iof existing systems n order to connect the clean room isolator to the various equipment at the technical room.
Piping Work
Industrial Facility
Relocation A&A Project .
Scope include consultation, design and re-route all piping works at new facility.
Oilfield Product
Oil & Gas
Consultancy, Design, manufacture and test to meet international standard, API and other special requirement.
Quality System & Process implementation.
bottom of page