
Contact: thomas.chong@azentiq.com +65 98199366
Projects




Process Air Duct
Pharmaceutical
Design, supply and install Stainless Steel Process Duct.
Existing technical room is full of equipment and our team has to manoeuvre through a maze of existing systems in order to connect the clean room isolator to the various equipment at the technical room.
Piping Work
Industrial Facility
Relocation A&A Project .
Scope include consultation, design and re-route all piping works at Brown and Green Field facilities.
Oilfield Product
Oil & Gas
Consultation, Design, Manufacture and Test to meet international standard, API and other special requirement.
Engineering System & Process implementation.
Process Improvement
Advanced Plastics Plant
Reverse Engineer critical process parts to ensure continuous non-interrupted operations of the plant.
Performs CFD Analysis and generate Digital Twins production and toolings capabilities for the critical processes.