top of page

Projects

Process Air Duct

 

 

Pharmaceutical

Design, supply and install Stainless Steel Process Duct.

Existing technical room is full of equipment and our team has to manoeuvre through a maze of existing systems in order to connect the clean room isolator to the various equipment at the technical room.

Piping Work

 

 

Industrial Facility

Relocation A&A Project .

 

Scope include consultation, design and re-route all piping works at Brown and Green Field facilities.

Oilfield Product

 

 

Oil & Gas

Consultation, Design, Manufacture and Test to meet international standard, API and other special requirement.

Engineering System & Process implementation.

Process Improvement

 

 

Advanced Plastics Plant

Reverse Engineer critical process parts to ensure continuous non-interrupted operations of the plant.

Performs CFD Analysis and generate Digital Twins production and toolings capabilities for the critical processes.

© 2025 by Azentiq Engineering. Proudly created with Wix.com

  • c-facebook
  • Twitter Classic
bottom of page